| OPERATIONAL MODELING AND SIMULATION OF AN INTER-BAY AMHS IN SEMICONDUCTOR WAFER FABRICATION (2007) | |||||||||||||
Abstract | |||||||||||||
| This paper studies the operational logic in an inter-bay automated material handling system (AMHS) in semiconductor wafer fabrication. This system consists of stockers located in a two-floor layout. Automated moving devices transfer lots between stockers within the same floor (intrafloor lot transfer) or between different floors (inter-floor lot transfer). Intra-floor lot-transferring transports use a tworail one-directional system, whereas inter-floor lottransferring transports use lifters. The decision problem consists of selecting rails and lifters that minimize average lot-delivery time. Several operation rules to deliver lots from source stocker to destination stocker are proposed and | |||||||||||||
Publication details | |||||||||||||
| |||||||||||||