| A BSP approach to the scheduling of tightly-nested loops (1997) | |||||||||||||||||
Abstract | |||||||||||||||||
| This paper addresses the scheduling of uniformdependence loop nests within the framework of the bulksynchronous parallel (BSP) model. Two broad classes of tightly-nested loops are identified in the paper and scheduled according to the BSP discipline, and the resulting schedules are analysed in terms of the BSP cost model. 1. | |||||||||||||||||
Publication details | |||||||||||||||||
| |||||||||||||||||