| Feasibility Study of a Neutron Time Of Flight Facility at the CERN-PS (1999) | |||||||||
Abstract | |||||||||
| This report summarises the feasibility study of a neutron time-of-flight facility at the CERN-PS as described in Refs. [1] and [2]. The idea is to extract at 24 GeV/cproton bunches (r.m.s. length ~7 ns) on to a target. The neutrons produced by spallation are directed to an experimental area located 230 m downstream throughout a vacuum pipe (diameter ~80 cm) making use of the existing TT2A tunnel about 7 m below the ISR tunnel | |||||||||
Publication details | |||||||||
| |||||||||