E. Peschardt

Publication List Details

Period

1990 - 2004

Number

55

Co-Authors

Calibration of centre-of-mass energies at LEP 2 for a precise measurement of the W boson mass (2004)

Assmann, R W, Barbero-Soto, E, Cornuet, D, Dehning, Bernd, Hildreth, M, Matheson, J, ...

The determination of the centre-of-mass energies for all LEP 2 running is presented. Accurate knowledge of these energies is of primary importance to set the absolute energy scale for the measurement...

Digital Signal Processing: State-of-the-Art at CERN and Recommendations (2002)

Angoletta, Maria Elena, González, J L, Peschardt, E, Serrano, J

Dramatic hardware performance improvements over the last decades have paved the way to the ascent of digital techniques for processing signals, with a concurrent and parallel interest in Digital...

Operating Experience with the LEP200 Superconducting RF System (2002)

Brown, P, Brunner, O C, Butterworth, A, Ciapala, Edmond, Frischholz, Hans, Geschonke, Günther, ...

By the beginning of 1999, after several stages of installation, the RF system in LEP had gained a final total of 288 four-cell SC cavities. For 2000, the last year of LEP running, eight original LEP1...

Ultimate Performance of the LEP RF System (2001)

Brown, P, Brunner, O C, Butterworth, A, Ciapala, Edmond, Frischholz, Hans, Geschonke, Günther, ...

The LEP Superconducting RF system reached its maximum configuration of 288 four-cell cavities powered by 36 klystrons in 1999. In 2000, this system, together with 56 cavities of the original copper...

Performance of the LEP200 superconducting RF system (2000)

Brown, P, Brunner, O C, Butterworth, A, Ciapala, Edmond, Frischholz, Hans, Geschonke, Günther, ...

The LEP Superconducting RF system has reached its maximum configuration of 288 four-cell cavities powered by 36 klystrons. This has allowed the beam energy to be raised from 45.6 GeV where physics of...

Evaluation of the LEP Centre-of-Mass Energy Above the W-Pair Production Threshold (1999)

Blondel, A, Böge, M, Bravin, Enrico, Bright-Thomas, P G, Camporesi, T, Dehning, Bernd, ...

Knowledge of the centre-of-mass energy at LEP2 is of primary importance to set the absolute energy scale for the measurement of the W-boson mass. The beam energy above 80 GeV is derived from...

Calibration of centre-of-mass energies at LEP1 for precise measurements of Z properties (1998)

Assmann, R W, Böge, M, Billen, R, Blondel, A, Bravin, Enrico, Bright-Thomas, P G, ...

The determination of the centre-of-mass energies from the LEP1 data for 1993, 1994 and 1995 is presented. Accurate knowledge of these energies is crucial in the measurement of the Z resonance param...

Experience with Bunch Train in LEP (1997)

Herr, Werner, Goddard, B, Keil, Eberhard, Lamont, M, Meddahi, Malika, Peschardt, E

Since 1995 LEP is operated with the new bunch train scheme. This scheme allows head-on collisions of four trains of up to four bunches within a train. The first experience with this new scheme and...

Bunch Trains for LEP (1997)

Goddard, B, Herr, Werner, Keil, Eberhard, Lamont, M, Meddahi, Malika, Peschardt, E

Since 1995 LEP has been operated with a bunch train scheme which allows head-on collisions of four trains of up to four bunches within a train. The proposal and its implementation are presented, and...

Report of the 1995 bunch train study group (1996)

Bovet, Claude, Brunner, O C, Goddard, B, Herr, Werner, Von Holtey, G, Keil, Eberhard, ...

In order to raise the luminosity LEP was operated in 1995 with four equidistant trains of bunches in each beam, instead of the usual four or eight single bunches. Each train consisted of up to four...