F. Gröschel

Publication List Details

Period

2002 - 2008

Number

26

Co-Authors

The MEGAPIE-TEST project: Supporting research and lessons learned in first-of-a-kind spallation target technology (2008)

Fazio, Concetta, Gröschel, F., Wagner, W., Thomsen, K., Smith, B.L., Stieglitz, R., ...

The megawatt pilot experiment (MEGAPIE) has been launched by six European institutions (PSI, FZK, CEA, SCK-CEN, ENEA and CNRS), JAEA (Japan), DOE (US) and KAERI (Korea) with the aim to carry out an...

Summary on the preliminary assessment of the T91 window performance in the MEGAPIE conditions. (2006)

Dai, Y., Fazio, C., Gorse, D., Gröschel, F., Henry, J., Terlain, A., ...

Internat.Conf.on Accelerator Applications 2005 (AccApp05), Venezia, I, August 29 - September 1, 2005

Volatile Elements Production Rates in a 1.4 GeV Proton-Irradiated Molten Lead-Bismuth Target (2004)

Zanini, L, Andersson, M, Everaerts, P, Fallot, M, Franberg, H, Gröschel, F, ...

Production rates of volatile elements following spallation reaction of 1.4 GeV protons on a liquid Pb/Bi target have been measured. The experiment was performed at the ISOLDE facility at CERN. These...

Volatile Elements Production Rates in a 1.4 GeV Proton-Irradiated Molten Lead-Bismuth Target (2004)

Zanini, L, Andersson, M, Everaerts, P, Fallot, M, Franberg, H, Gröschel, F, ...

Production rates of volatile elements following spallation reaction of 1.4 GeV protons on a liquid Pb/Bi target have been measured. The experiment was performed at the ISOLDE facility at CERN. These...

Final Summary Report on Target Design (2004)

Cadiou, A., Guertin, A., Kirchner, T., Stutzmann, J.S., Vatre, M., Gautier, J.M, ...

The present document is the D13 deliverable report of work package 1, Target Development, from the MEGAPIE TEST project of the 5th European Framework Program. Deliverable D13 is the final summary...

Final Summary Report on Target Design (2004)

Cadiou, A., Guertin, A., Kirchner, T., Stutzmann, J.S., Vatre, M., Gautier, J.M, ...

The present document is the D13 deliverable report of work package 1, Target Development, from the MEGAPIE TEST project of the 5th European Framework Program. Deliverable D13 is the final summary...

Final Summary Report on Target Design (2004)

Cadiou, A., Guertin, A., Kirchner, T., Stutzmann, J.S., Vatre, M., Gautier, J.M, ...

The present document is the D13 deliverable report of work package 1, Target Development, from the MEGAPIE TEST project of the 5th European Framework Program. Deliverable D13 is the final summary...

Final Summary Report on Target Design (2004)

Cadiou, A., Guertin, A., Kirchner, T., Stutzmann, J.S., Vatre, M., Gautier, J.M, ...

The present document is the D13 deliverable report of work package 1, Target Development, from the MEGAPIE TEST project of the 5th European Framework Program. Deliverable D13 is the final summary...

Final Summary Report on Target Design (2004)

Cadiou, A., Guertin, A., Kirchner, T., Stutzmann, J.S., Vatre, M., Gautier, J.M, ...

The present document is the D13 deliverable report of work package 1, Target Development, from the MEGAPIE TEST project of the 5th European Framework Program. Deliverable D13 is the final summary...

LiSoR, a liquid metal loop for material investigation under irradiation (2003)

Kirchner, T., Bortoli, Y., Cadiou, A., Foucher, Y., Stutzmann, J.S., Auger, T., ...

LiSoR is a liquid metal loop that will use PSI's 72 MeV Philips cyclotron to irradiate stressed steel specimens in contact with flowing lead-bismuth with 50µA proton beam. LiSoR is a joint effort of...

Progress Report on Target Development (2003)

Cadiou, A., Foucher, Y., Guertin, A., Kirchner, T., Stutzmann, J.S., Gautier, J.M, ...

The present document is the D08 deliverable report of work package 1 (Target Development) from the MEGAPIE TEST project of the 5th European Framework Program. Deliverable D08 is the progress report...

LiSoR, a liquid metal loop for material investigation under irradiation (2003)

Kirchner, T., Bortoli, Y., Cadiou, A., Foucher, Y., Stutzmann, J.S., Auger, T., ...

LiSoR is a liquid metal loop that will use PSI's 72 MeV Philips cyclotron to irradiate stressed steel specimens in contact with flowing lead-bismuth with 50µA proton beam. LiSoR is a joint effort of...

Progress Report on Target Development (2003)

Cadiou, A., Foucher, Y., Guertin, A., Kirchner, T., Stutzmann, J.S., Gautier, J.M, ...

The present document is the D08 deliverable report of work package 1 (Target Development) from the MEGAPIE TEST project of the 5th European Framework Program. Deliverable D08 is the progress report...

Progress Report on Target Development (2003)

Cadiou, A., Foucher, Y., Guertin, A., Kirchner, T., Stutzmann, J.S., Gautier, J.M, ...

The present document is the D08 deliverable report of work package 1 (Target Development) from the MEGAPIE TEST project of the 5th European Framework Program. Deliverable D08 is the progress report...

Progress Report on Target Development (2003)

Cadiou, A., Foucher, Y., Guertin, A., Kirchner, T., Stutzmann, J.S., Gautier, J.M, ...

The present document is the D08 deliverable report of work package 1 (Target Development) from the MEGAPIE TEST project of the 5th European Framework Program. Deliverable D08 is the progress report...

Progress Report on Target Development (2003)

Cadiou, A., Foucher, Y., Guertin, A., Kirchner, T., Stutzmann, J.S., Gautier, J.M, ...

The present document is the D08 deliverable report of work package 1 (Target Development) from the MEGAPIE TEST project of the 5th European Framework Program. Deliverable D08 is the progress report...

Tensile tests on MANET II steel in circulating Pb-Bi eutectic. (2003)

Glasbrenner, H., Gröschel, F., Kirchner, T.

5th Internat.Workshop on Spallation Materials Technology (IWSMT-5), Charleston, S.C., May 19-24, 2002

LiSoR, a liquid metal loop for material investigation under irradiation. (2003)

Kirchner, T., Bortoli, Y., Cadiou, A., Foucher, Y., Stutzmann, J.S., Auger, T., ...

5th Internat.Workshop on Spallation Materials Technology (IWSMT-5), Charleston, S.C., May 19-24, 2002

Expansion of solidified lead bismuth eutectic. (2003)

Glasbrenner, H., Gröschel, F., Grimmer, H., Patorski, J., Rohde, M.

6th Internat.Workshop on Spallation Materials Technology (IWSMT-6), Hayama, J, November 30 - December 5, 2003

MEGAPIE-TEST: A European project on spallation target testing. (2002)

Knebel, J.U., Klein, J.C., Gorse, D., Agostini, P., Gröschel, F., Kupschus, P., ...

AccApp/ADTTA ' 01 : 5th Topical Meeting on Nuclear Applications of Accelerator Technology, Reno, Nev., November 11-15, 2001

MEGAPIE target design and LiSoR experiment - status report. (2002)

Auger, T., Aphecetche, L., Cadiou, A., Dai, Y., Glasbrenner, H., Gröschel, F., ...

Structural Materials for Hybrid Systems: A Challenge in Metallurgy, Paris, F, October 29-31, 2001