Cost-Estimating Relationships for Aircraft Airframes, (2002)
Levenson,G. S., Boren,H. E. , Jr., Tihansky,D. P., Timson,F.
This report presents generalized cost-estimating relationships for estimating development and production costs of aircraft airframes in a long-range planning context. It provides separate estimating...
Advanced Composite Cost Estimating Manual. Volume I (2002)
LeBlanc, Donald J., Lorenzana, J., Kokawa, A., Bettner, T., Timson, F.
This program concentrated on the development of a computerized system that estimates the recurring costs associated with the fabrication of advanced composite detail parts and components. The system...
Advanced Composite Cost Estimating Manual. Volume II. Appendix (2002)
LeBlanc, Donald J., Lorenzana, J., Kokawa, A., Bettner, T., Timson, F.
Contents: Computer Program Listing; Permanent Input Data Sets; Job Control Language and Sample Estimates.
Advanced Composite Cost Estimating Manual. Volume II (2002)
LeBlanc, Donald J., Lorenzana, J., Kokawa, A., Bettner, T., Timson, F.
Contents: Input Forms; Keypunching Data Cards; and Estimating Equations.