The Development of the Process Protocol Mapping Methodology and Tool (2008)
S. Wu, A. Fleming, G. Aouad, R. Cooper
the University of Salford in 1998. It is a high-level process map that aimed to provide a framework to help companies achieve an improved design and construction process. Furthermore, industry...
There is an increasing realisation of the importance of operation and maintenance as opposed to capital costs throughout the life of an asset. In addition, new styles of contracts such as PFI...
VISCON: COMPUTER VISUALISATION SUPPORT FOR CONSTRUCTABILITY (2005)
G. Aouad, A. Lee, S. Wu, A. A. Ganah, N. B. Bouchlaghem, C. J. Anumba
SUMMARY: The construction industry has a reputation for low productivity, waste, low use of new technologies, and poor quality (Egan, 1998, Wakefield and Damrianant 1999). It is estimated that up to...