G. Aouad

Publication List Details

Period

2005 - 2008

Number

4

Co-Authors

The Development of the Process Protocol Mapping Methodology and Tool (2008)

S. Wu, A. Fleming, G. Aouad, R. Cooper

the University of Salford in 1998. It is a high-level process map that aimed to provide a framework to help companies achieve an improved design and construction process. Furthermore, industry...

paper w78-1999-2901.content THE DEVELOPMENT OF AN INTEGRATED LIFE CYCLE COSTING MODEL USING OBJECT ORIENTED AND VR TECHNOLOGIES (2008)

A. Al-hajj, G. Aouad

There is an increasing realisation of the importance of operation and maintenance as opposed to capital costs throughout the life of an asset. In addition, new styles of contracts such as PFI...

VISCON: COMPUTER VISUALISATION SUPPORT FOR CONSTRUCTABILITY (2005)

G. Aouad, A. Lee, S. Wu, A. A. Ganah, N. B. Bouchlaghem, C. J. Anumba

SUMMARY: The construction industry has a reputation for low productivity, waste, low use of new technologies, and poor quality (Egan, 1998, Wakefield and Damrianant 1999). It is estimated that up to...