Abstract Control Loop for a Pulse Generator of a Fast Septum Magnet using DSP and Fuzzy Logic (2007)
E. Aldaz Carroll, E. Carlier, J. H. Dieperink, G. H. Schroer, E. Vossenberg
A prototype of a fast pulsed eddy current septum magnet for one of the beam extraction’s from the SPS towards LHC is under development. The precision of the magnetic field must be better than ±1.0...
Setting-up of TT60 for the run 17-20 December, 1976 (2006)
Weisse, E, Evans, L, Siegel, N, Bosser, Jacques, Dieperink, J H
Faults Detection on the LHC Beam Dump Kicker System (2003)
Dissing, T, Blanke, M, Dieperink, J H
This report describes a proposal for fault detection on the LHC beam dump kicker system. As a result of a fault analysis two fault detection modules are proposed; A off-line test and a continuous...
A Novel Eddy Current Septum Magnet for SPS Extraction towards LHC and CNGS (2000)
Schröder, G H, Weisser, W, Carlier, E, Dieperink, J H, Ducimetière, L, Goddard, B, ...
A new East Fast-Extraction System is under construction in the SPS, to supply particles with a maximum batch length of 7.8 us and 10.5 us to the LHC and to CNGS (CERN Neutrino to Gran Sasso),...
A Novel Eddy Current Septum Magnet For SPS Extraction Towards LHC And CNGS (2000)
G. H. Schröder, W. Weisser, E. Carlier, J. H. Dieperink, L. Ducimeti&egravve;re, L. Ducimetière, ...
A new East Fast-Extraction System is under construction in the SPS, to supply particles with a maximum batch length of 7.8 s and 10.5 s to the LHC and to CNGS (CERN Neutrino to Gran Sasso),...
Fault Detection on the LHC Beam Dump Kicker System (1999)
Dissing, T, Blanke, M, Dieperink, J H
This report describes a proposal for fault detection on the LHC beam dump kicker system. As a result of a fault analysis two fault detection modules are proposed; A off-line test and a continuous...
Control Loop for a Pulse Generator of a Fast Septum Magnet using DSP and Fuzzy Logic (1998)
Aldaz-Carroll, E, Carlier, E, Dieperink, J H, Schröder, G, Vossenberg, Eugène B
A prototype of a fast pulsed eddy current septum magnet for one of thebeam extraction's from the SPS towards LHC is under development. The precision of the magnetic field must be better than ±1.0...
Design aspects related to the reliability of the LHC beam dump kicker systems (1997)
Dieperink, J H, Bretin, J L, Carlier, E, Ducimetière, L, Schröder, G, Vossenberg, Eugène B
The two LHC beam dump kicker systems consist each of 14 pulse generator and magnet subsystems. Their task is to extract on request the beams in synchronisation with the gap in the beam. This...
Design aspects related to the reliability of the LHC beam dump kicker systems (1997)
Dieperink, J H, Bretin, J L, Carlier, E, Ducimetière, L, Schröder, G, Vossenberg, Eugène B
The two LHC beam dump kicker systems consist each of 14 pulse generator and magnet subsystems. Their task is to extract on request the beams in synchronisation with the gap in the beam. This...
Construction problems with large proportional wire chambers (1996)
Dieperink, J H, Kleinknecht, K, Steffen, P, Steinberger, Jack, Trippe, T G, Vannucci, François
Balhan, B, Burton, A, Carlier, E, Dieperink, J H, Mertens, V
The TS Tool Kit is a generic, fully data-driven, and user-configurable software system developed at CERN for supervisory, control, and data acquisition applications. It provides a comprehensive...
Modification of the LEP electrostatic separator systems for operation with bunch trains (1995)
Balhan, B, Burton, A, Carlier, E, Deluen, J P, Dieperink, J H, Garrel, N, ...
To meet the LEP2 luminosity requirements for W-pair production, it is planned to operate LEP with Bunch Trains from 1995 onwards. This new mode of operation entails significant modification both to...
The new control system for the LEP pretzel separators (1993)
Mertens, V, Aimar, A, Bobbio, P, Carlier, E, Dieperink, J H, Goddard, B, ...
SPS/LEP beam transfer equipment control using industrial automation components (1992)
Aimar, A, Bérard, G, Bretin, J L, Carlier, E, Dieperink, J H, Laffin, M, ...
Surveillance and diagnostic tools for the LEP beam separation system (1990)
Bérard, G, Dieperink, J H, Finiel, R, Kalbreier, Willi, Mertens, V, Ninet, M
Time dependent structure and spill measurements of proton beams at the CERN SPS (1990)
Bosser, Jacques, Dieperink, J H, Ferioli, G, Mann, J, Warstki, L