J. M. Gautier

Publication List Details

Period

1948 - 2009

Number

35

Co-Authors

TIARA: a large solid angle silicon array for direct reaction studies with radioactive beams (2009)

Labiche, M., Catford, W. N., Lemmon, R. C., Timis, C. N., Orr, N. A., Fernandez-Dominguez, B., ...

A compact, quasi-4pi position sensitive silicon array, TIARA, designed to study direct reactions induced by radioactive beams in inverse kinematics is described here. The Transfer and Inelastic...

The GUINEVERE Project for Accelerator Driven System Physics (2009)

Billebaud, A., Baeten, P., Aït Abderrahim, H., Ban, G., Baylac, M., Bergmans, G., ...

The GUINEVERE project is part of the EUROTRANS Integrated Project of the 6th EURATOM Framework Programme. It is mainly devoted to ADS on-line reactivity monitoring validation, sub-criticality...

The GUINEVERE Project for Accelerator Driven System Physics (2009)

Billebaud, A., Baeten, P., Aït Abderrahim, H., Ban, G., Baylac, M., Bergmans, G., ...

The GUINEVERE project is part of the EUROTRANS Integrated Project of the 6th EURATOM Framework Programme. It is mainly devoted to ADS on-line reactivity monitoring validation, sub-criticality...

The GUINEVERE Project for Accelerator Driven System Physics (2009)

Billebaud, A., Baeten, P., Aït Abderrahim, H., Ban, G., Baylac, M., Bergmans, G., ...

The GUINEVERE project is part of the EUROTRANS Integrated Project of the 6th EURATOM Framework Programme. It is mainly devoted to ADS on-line reactivity monitoring validation, sub-criticality...

Mes documents sur l'exploitation : description et éléments de gestion (2007)

Abt, V., Sellam, M., Gautier, J.M., Gilain-Gaillot, C., Verjux, N., Camponovo-Michel, A., ...

/ Les fortes pressions sociétales (qualité et sécurité des produits, préservation de l'environnement), l'évolution des services et des filières de production et la réforme des modes...

Final Summary Report on Target Design (2004)

Cadiou, A., Guertin, A., Kirchner, T., Stutzmann, J.S., Vatre, M., Gautier, J.M, ...

The present document is the D13 deliverable report of work package 1, Target Development, from the MEGAPIE TEST project of the 5th European Framework Program. Deliverable D13 is the final summary...

Final Summary Report on Target Design (2004)

Cadiou, A., Guertin, A., Kirchner, T., Stutzmann, J.S., Vatre, M., Gautier, J.M, ...

The present document is the D13 deliverable report of work package 1, Target Development, from the MEGAPIE TEST project of the 5th European Framework Program. Deliverable D13 is the final summary...

Final Summary Report on Target Design (2004)

Cadiou, A., Guertin, A., Kirchner, T., Stutzmann, J.S., Vatre, M., Gautier, J.M, ...

The present document is the D13 deliverable report of work package 1, Target Development, from the MEGAPIE TEST project of the 5th European Framework Program. Deliverable D13 is the final summary...

Final Summary Report on Target Design (2004)

Cadiou, A., Guertin, A., Kirchner, T., Stutzmann, J.S., Vatre, M., Gautier, J.M, ...

The present document is the D13 deliverable report of work package 1, Target Development, from the MEGAPIE TEST project of the 5th European Framework Program. Deliverable D13 is the final summary...

Final Summary Report on Target Design (2004)

Cadiou, A., Guertin, A., Kirchner, T., Stutzmann, J.S., Vatre, M., Gautier, J.M, ...

The present document is the D13 deliverable report of work package 1, Target Development, from the MEGAPIE TEST project of the 5th European Framework Program. Deliverable D13 is the final summary...

Progress Report on Target Development (2003)

Cadiou, A., Foucher, Y., Guertin, A., Kirchner, T., Stutzmann, J.S., Gautier, J.M, ...

The present document is the D08 deliverable report of work package 1 (Target Development) from the MEGAPIE TEST project of the 5th European Framework Program. Deliverable D08 is the progress report...

Progress Report on Target Development (2003)

Cadiou, A., Foucher, Y., Guertin, A., Kirchner, T., Stutzmann, J.S., Gautier, J.M, ...

The present document is the D08 deliverable report of work package 1 (Target Development) from the MEGAPIE TEST project of the 5th European Framework Program. Deliverable D08 is the progress report...

Progress Report on Target Development (2003)

Cadiou, A., Foucher, Y., Guertin, A., Kirchner, T., Stutzmann, J.S., Gautier, J.M, ...

The present document is the D08 deliverable report of work package 1 (Target Development) from the MEGAPIE TEST project of the 5th European Framework Program. Deliverable D08 is the progress report...

Progress Report on Target Development (2003)

Cadiou, A., Foucher, Y., Guertin, A., Kirchner, T., Stutzmann, J.S., Gautier, J.M, ...

The present document is the D08 deliverable report of work package 1 (Target Development) from the MEGAPIE TEST project of the 5th European Framework Program. Deliverable D08 is the progress report...

Progress Report on Target Development (2003)

Cadiou, A., Foucher, Y., Guertin, A., Kirchner, T., Stutzmann, J.S., Gautier, J.M, ...

The present document is the D08 deliverable report of work package 1 (Target Development) from the MEGAPIE TEST project of the 5th European Framework Program. Deliverable D08 is the progress report...