J. M. Pentney

Publication List Details

Period

1990 - 2007

Number

30

Co-Authors

ATLAS Level-1 Calorimeter Trigger System Architecture (2007)

Bright-Thomas Connors, P. Bright-thomas, A. Connors, J. Garvey, S. Hillier, R. Staley, ...

The Level-1 Calorimeter Trigger is a fast pipelined system for the selection of rare physics processes in the ATLAS experiment at LHC. Its selectivity contributes to a rate reduction from the 40 MHz...

The e/γ and τ/hadron Processor System for the ATLAS First-Level Trigger (2007)

V. Perera, J. Edwards, A. Gillman, R. Hatley, A. J. Maddox, ...

The e/g and t/hadron first-level trigger system for ATLAS will provide electron/photon and tau/hadron trigger multiplicity information to the Central Trigger Processor (CTP), and region of interest...

RD27 note 34 ATLAS Note DAQ--NO--30 17 January 1995 THE LEVEL-1 CALORIMETER TRIGGER SYSTEM (2007)

For Atlas Brawn, I. P. Brawn, R. E. Carney, J. Garvey, D. Rees, R. Staley, ...

We describe the design of a digital calorimeter trigger processor system which could form a major part of the ATLAS level-1 trigger system. Utilising novel techniques, but with today's...

CERN/DRDC 94--52 RD27 Status Report 9 January 1994 FIRST-LEVEL TRIGGER SYSTEMS FOR LHC EXPERIMENTS (2007)

Brawn Carney Ermoline, I. Brawn, R. E. Carney, Y. Ermoline, J. Garvey, D. Grant, ...

this document we report on the work that has been performed and propose a programme of R&D for the next 12 months. We discuss in turn the calorimeter, muon and central trigger processors, and...

A Demonstrator Programme For The Atlas Level-1 Calorimeter Trigger (1995)

I. P. Brawn, R.E. Carney, J. Garvey, D. Rees, R. Staley, P. Watkins, ...

This document describes work to demonstrate the feasibility of the level-1 trigger design presented in the ATLAS Technical Proposal. In the phase-I programme already completed, a prototype custom...

First-Level Trigger Systems For Lhc Experiments (1994)

I. Brawn, R.E. Carney, Y. Ermoline, J. Garvey, D. Grant, R. Harris, ...

this document we report on the work that has been performed and propose a programme of R&D for the next 12 months. We discuss in turn the calorimeter, muon and central trigger processors, and...