Progress in the study and construction of the tesla test facility injector (2008)

Chehab, R., Bernard, M., Bourdon, J.C., Garvey, T., Jacquemard, B., Mencik, M., ...

A 500 MeV, 1.3 GHz superconducting linear accelerator is being studied and built to serve as a test facility for the TESLA linear collider project. The phase 1 injector, having an energy of 8-14 MeV...

Construction, assembly and tests of the ATLAS electromagnetic barrel calorimeter (2006)

Aubert, B., Beaugiraud, B., Colas, J., Delebecque, P., Di Ciaccio, L., El Kacimi, M., ...

The construction and assembly of the two half barrels of the ATLAS central electromagnetic calorimeter and their insertion into the barrel cryostat are described. The results of the qualification...

Construction, assembly and tests of the ATLAS electromagnetic barrel calorimeter (2006)

Aubert, B., Beaugiraud, B., Colas, J., Delebecque, P., Di Ciaccio, L., El Kacimi, M., ...

The construction and assembly of the two half barrels of the ATLAS central electromagnetic calorimeter and their insertion into the barrel cryostat are described. The results of the qualification...

Construction, assembly and tests of the ATLAS electromagnetic barrel calorimeter (2006)

Aubert, B., Beaugiraud, B., Colas, J., Delebecque, P., Di Ciaccio, L., El Kacimi, M., ...

The construction and assembly of the two half barrels of the ATLAS central electromagnetic calorimeter and their insertion into the barrel cryostat are described. The results of the qualification...

Construction, assembly and tests of the ATLAS electromagnetic barrel calorimeter (2006)

Aubert, B., Beaugiraud, B., Colas, J., Delebecque, P., Di Ciaccio, L., El Kacimi, M., ...

The construction and assembly of the two half barrels of the ATLAS central electromagnetic calorimeter and their insertion into the barrel cryostat are described. The results of the qualification...

Construction, assembly and tests of the ATLAS electromagnetic barrel calorimeter (2006)

Aubert, B., Beaugiraud, B., Colas, J., Delebecque, P., Di Ciaccio, L., El Kacimi, M., ...

The construction and assembly of the two half barrels of the ATLAS central electromagnetic calorimeter and their insertion into the barrel cryostat are described. The results of the qualification...

Construction, assembly and tests of the ATLAS electromagnetic barrel calorimeter (2005)

Aubert, B, Beaugiraud, B, Colas, Jacques, Delebecque, P, Di Ciaccio, L, El-Kacimi, M, ...

The construction and assembly of the two half barrels of the ATLAS central electromagnetic calorimeter and their insertion into the barrel cryostat are described. The results of the qualification...

Progress in the study and construction of the tesla test facility injector (1996)

Chehab, R., Bernard, M., Bourdon, J.C., Garvey, T., Jacquemard, B., Mencik, M., ...

A 500 MeV, 1.3 GHz superconducting linear accelerator is being studied and built to serve as a test facility for the TESLA linear collider project. The phase 1 injector, having an energy of 8-14 MeV...

Progress in the study and construction of the tesla test facility injector (1996)

Chehab, R., Bernard, M., Bourdon, J.C., Garvey, T., Jacquemard, B., Mencik, M., ...

A 500 MeV, 1.3 GHz superconducting linear accelerator is being studied and built to serve as a test facility for the TESLA linear collider project. The phase 1 injector, having an energy of 8-14 MeV...

Progress in the study and construction of the tesla test facility injector (1996)

Chehab, R., Bernard, M., Bourdon, J.C., Garvey, T., Jacquemard, B., Mencik, M., ...

A 500 MeV, 1.3 GHz superconducting linear accelerator is being studied and built to serve as a test facility for the TESLA linear collider project. The phase 1 injector, having an energy of 8-14 MeV...