Lisa A. Schaefer, Philip M. Wolfe, John Fowler, Timothy E. Lindquist
Please note that this manuscript has yet to be accepted by Complexity International Simulation meta-architecture for analyzing the emergent behavior of agents
MULTIPROJECT SCHEDULING WITH LIMITED RESOURCES: A ZERO-ONE PROGRAMMING APPROACH (2005)
Pritsker, A. Alan B., Watters, Lawrence J., Wolfe, Philip M.
A zero-one (0-1) linear programming formulation of multiproject and job-shop scheduling problems is presented that is more general and computationally tractable than other known formulations. It can...
MATHEMATICAL FORMULATION: A PROBLEM IN DESIGN (2005)
Watters, Lawrence J., Pritsker, A. Alan B., Wolfe, Philip M.
The relationship between formulation and design is examined. The main aspects of mathematical formulation are the development of definitions of variables and the functional relationships of the...
Development of a War Readiness Spares Kit Model and Solution Technique. (2002)
Terrell,M. Palmer, Wolfe,Philip M.
This final report describes work completed under Research Number F33600-80-C-0423 during the period July 1980 through December 1980. This effort was performed for the United States Air Force...
Plant layout with a travel chart and a computer / (1965)
Thesis (Engineering report M.S.E.)--Arizona State University, 1965.