S. Buono

Publication List Details

Period

1990 - 2007

Number

66

Co-Authors

First Commissioning Results of the n_TOF Facility at CERN (2004)

Borcea, C, Buono, S, Cennini, P, Dahlfors, M, Dangendorf, V, Ferrari, A, ...

n_TOF, the new neutron time of flight facility at CERN, is now operational and has been commisioned.

Radioprotection and Shielding Aspects of the nTOF Spallation Source (2002)

Vlachoudis, V, Borcea, C, Buono, S, Cennini, P, Dahlfors, M, Ferrari, A, ...

The neutron Time of Flight (nTOF) facility at CERN is a high flux neutron source obtained by the spallation of 20 GeV/c protons onto a solid lead target. The first experimental measurements performed...

L'Energy Amplifier di Rubbia: gli studi per la produzione di un'energia nucleare pulita ed il loro impatto sul piano economico (2002)

Sessano, D, Buono, S, Panizza, R

The growing interest towards new energy forms is a common feature of many different studying fields: physics, engineering, economics and politics. The main reason is that human population is growing...

Experimental Verification of Neutron Phenomenology in Lead and Transmutation by Adiabatic Resonance Crossing in Accelerator Driven Systems (1999)

Abánades, A, Aleixandre, J, Andriamonje, Samuel A, Angelopoulos, Angelos, Apostolakis, Alcibiades J, Arnould, H, ...

Energy and space distributions of spallation neutrons (from 2.5 and 3.57 GeV/c CERN proton beams) slowing down in a 3.3 x 3.3 x 3 m3 lead volume and neutron capture rates on long-lived fission...

Feasibility Study of a Neutron Time Of Flight Facility at the CERN-PS (1999)

Andriamonje, Samuel A, Watson, T, Zanolli, M, Buono, S, Buttkus, J, Cennini, E, ...

This report summarises the feasibility study of a neutron time-of-flight facility at the CERN-PS as described in Refs. [1] and [2]. The idea is to extract at 24 GeV/cproton bunches (r.m.s. length ~7...

Experimental verification of neutron phenomenology in lead and transmutation by adiabatic resonance crossing in accelerator driven systems (1999)

Arnould, H., Bompas, C A., Del Moral, R., Lacoste, V., Vlachoudis, V., Aleixandre, J., ...

Energy and space distributions of spallation neutrons (from 2.5 and 3.57 GeV/c CERN proton beams) slowing down in a 3.3 x 3.3 x 3 m3 lead volume and neutron capture rates on long-lived fission...

Experimental verification of neutron phenomenology in lead and transmutation by adiabatic resonance crossing in accelerator driven systems (1999)

Arnould, H., Bompas, C A., Del Moral, R., Lacoste, V., Vlachoudis, V., Aleixandre, J., ...

Energy and space distributions of spallation neutrons (from 2.5 and 3.57 GeV/c CERN proton beams) slowing down in a 3.3 x 3.3 x 3 m3 lead volume and neutron capture rates on long-lived fission...

Experimental verification of neutron phenomenology in lead and transmutation by adiabatic resonance crossing in accelerator driven systems (1999)

Arnould, H., Bompas, C.A., Del Moral, R., Lacoste, V., Vlachoudis, V., Aleixandre, J., ...

Energy and space distributions of spallation neutrons (from 2.5 and 3.57 GeV/c CERN proton beams) slowing down in a 3.3 x 3.3 x 3 m3 lead volume and neutron capture rates on long-lived fission...

Experimental verification of neutron phenomenology in lead and transmutation by adiabatic resonance crossing in accelerator driven systems (1999)

Arnould, H., Bompas, C.A., Del Moral, R., Lacoste, V., Vlachoudis, V., Aleixandre, J., ...

Energy and space distributions of spallation neutrons (from 2.5 and 3.57 GeV/c CERN proton beams) slowing down in a 3.3 x 3.3 x 3 m3 lead volume and neutron capture rates on long-lived fission...

Experimental verification of neutron phenomenology in lead and transmutation by adiabatic resonance crossing in accelerator driven systems (1999)

Arnould, H., Bompas, C.A., Del Moral, R., Lacoste, V., Vlachoudis, V., Aleixandre, J., ...

Energy and space distributions of spallation neutrons (from 2.5 and 3.57 GeV/c CERN proton beams) slowing down in a 3.3 x 3.3 x 3 m3 lead volume and neutron capture rates on long-lived fission...

A High Resolution Spallation Driven Facility at the CERN-PS to Measure Neutron Cross Sections in the Interval from 1 eV to 250 MeV: a Relative Performance Assessment (1998)

Rubbia, Carlo, Andriamonje, Samuel A, Bouvet-Bensimon, D, Buono, S, Cappi, R, Cennini, P, ...

In the proposed facility with 24 GeV PS beam on a Lead target, the number of produced neutrons exceeds 760 per proton. In comparison, with a LINAC (GELINA) one currently obtains only about 0.05...

Fast neutron incineration in the energy amplifier as alternative to geologic storage: the case of Spain (1997)

Rubbia, Carlo, Buono, S, Kadi, Y, Rubio, Juan Antonio

In previous reports [1][2] we have presented the conceptual design of a fast neutron driven sub-critical device (Energy Amplifier) designed both for energy amplification (production) and for the...

Results from a combined test of an electromagnetic liquid argon calorimeter with a hadronic scintillating-tile calorimeter (1996)

Ajaltouni, Ziad J, Albiol, F, Alifanov, A, Amaral, P, Ambrosini, G, Amorim, A, ...

The first combined test of an electromagnetic liquid argon accordion calorimeter and a hadronic scintillating-tile calorimeter was carried out at the CERN SPS. These devices are prototypes of the...

Conceptual design of a fast neutron operated high power energy amplifier (1995)

Roche, Ch., Revol, J.P., Mandrillon, P., Klapisch, R., Kadi, Y., Gelès, C., ...

"The EA operates indefinitely in a closed cycle, namely the discharge of a fuel load, with the exception of fission fragments, is re-injected in the sub-critical unit with the addition of natural...

Software engineering techniques and CASE tools in RD13 (1994)

Buono, S., Gaponenko, I A., Jones, R., Khodabandeh, A., Mapelli, L P., Mornacchi, G., ...

The RD13 project was approved in April 1991 for the development of a scalable data-taking system suitable for hosting various LHC studies. One of its goals is the exploitation of software engineering...

Software engineering techniques and CASE tools in RD13 (1994)

Buono, S., Gaponenko, I A., Jones, R., Khodabandeh, A., Mapelli, L P., Mornacchi, G., ...

The RD13 project was approved in April 1991 for the development of a scalable data-taking system suitable for hosting various LHC studies. One of its goals is the exploitation of software engineering...