Première mise en service de la ligne P0 jusqu'à T8 (2007)
Atherton, H, Danner, B, Dieperink, J, Doble, N, Jacot, C, Niquille, C, ...
Investigation of the working point $Q_{H}$ = 25.62, $Q_{V}$ = 25.57 for 450 GeV operation (2007)
Burnod, L, Hilaire, A, Lauckner, R, Miles, J, Péraire, S, Rossi, V
Beam Dumps and Beam Stoppers for LHC and CNGS Transfer Lines (2001)
Three new beam transfer lines are presently under construction at the SPS: TI2 and TI8 which will transfer protons and ions to the LHC, and TT41 which will transfer protons to the CNGS neutrino...
Many of the CERN secondary-particle production targets are plate shaped, and intercept a centred 'slow' extracted (order of ms) primary beam, which heats the material. This heat distribution can be...
Impact of and Protection against Failures of the LHC Injection Kickers (1999)
Brüning, Olivier Sim, Hilaire, A, Jeanneret, J B, Péraire, S, Mertens, V, Sala-Ferrari, P, ...
Impact of and Protection against Failures of the LHC Injection Kickers (1999)
Brüning, Oliver Simon, Hilaire, A, Jeanneret, J B, Péraire, S, Mertens, V, Sala-Ferrari, P, ...
Design studies of the LHC beam dump (1997)
This paper is a compilation of the results of the recent 5 years studies of the beam dump system for the LHC proton collider at CERN, with a special emphasis on feasibility of the central absorber....
Design studies of the LHC beam dump (1997)
This paper is a compilation of the results of the recent 5 years studies of the beam dump system for the LHC proton collider at CERN, with a special emphasis on feasibility of the central absorber....
This second part of the LHC beam dump design study is devoted to transient and steady state nonlinear heat transfer analysis. Heat generation loads are imported from Part - I: simulation of energy...
This first part of the LHC beam dump design study is devoted to problems requiring simulation of energy deposition by particle cascades, which determine the physical state of the dump immediately...
CERN West Area neutrino facility beam line alignment (1996)
Catanesi, M G, Falaleev, V P, Péraire, S, De Rijk, G, Tsesmelis, E, Plothow-Besch, Hartmute, ...
This papers describes the alignment of the West Area Neutrino Beam Line at CERN to the two neutrino experiments CHORUS and NOMAD. The T9 neutrino (n) target position and the position of the magnetic...
The SPS Target Station for CHORUS and NOMAD Neutrino Experiments (1996)
Péraire, S, Ross, M, Zazula, J M
A new SPS target station, T9, has been constructed for the CHORUS and NOMAD neutrino experiments at CERN. The heart of the station is the target box : 11 beryllium rods are aligned in a cast...
The SPS Target Station for CHORUS and NOMAD Neutrino Experiments (1996)
Péraire, S, Ross, M, Zazula, J M
A new SPS target station, T9, has been constructed for the CHORUS and NOMAD neutrino experiments at CERN. The heart of the station is the target box : 11 beryllium rods are aligned in a cast...
The LEP beam dumping system (1994)
Carlier, E, Jansson, U, Jung, R, Mertens, V, Péraire, S, Ross, M, ...
First results on proton extraction from the CERN-SPS with a bent crystal (1993)
Akbari, H, Altuna, X, Bardin, S, Bellazzini, R, Biryukov, V M, Brez, A, ...