Shi-Chung Chang

Publication List Details

Period

1951 - 2009

Number

11

Co-Authors

A 1600-MIPS Parallel Processor IC for Job-Shop Scheduling (2009)

Kuan-hung Chen, Student Member, Tzi-dar Chiueh, Senior Member, Shi-chung Chang, Peter B. Luh

Abstract—A job shop is a typical environment for manufacturing low-volume and high-variety discrete parts, where parts are of various due dates, priorities, and sequences of production operations....

Group Elevator Scheduling With Advance Information for Normal and Emergency Modes (2009)

Peter B. Luh, Bo Xiong, Shi-chung Chang

Abstract—Group elevator scheduling has long been recognized as an important problem for building transportation efficiency, since unsatisfactory elevator service is one of the major complaints of...

Payment Cost Minimization Auction for Deregulated Electricity Markets With Transmission Capacity Constraints (2009)

Feng Zhao, Student Member, Peter B. Luh, Joseph H. Yan, Senior Member, Gary A. Stern, ...

Abstract—Deregulated electricity markets in the U.S. currently use an auction mechanism that minimizes total supply bid costs to select bids and their levels. Payments are then settled based on...

Efficient Simulation-Based Composition of Scheduling Policies by Integrating Ordinal Optimization With Design of Experiment (2008)

Bo-wei Hsieh, Chun-hung Chen, Senior Member, Shi-chung Chang

Abstract—Semiconductor wafer fab operations are characterized by complex and reentrant production processes over many heterogeneous machine groups with stringent performance requirements. Efficient...

Payment Cost Minimization Auction for Deregulated Electricity Markets Using Surrogate Optimization (2008)

Peter B. Luh, William E. Blankson, Student Member, Ying Chen, Student Member, Joseph H. Yan, ...

Abstract—Deregulated electricity markets use an auction mechanism to select offers and their power levels for energy and ancillary services. A settlement mechanism is then used to determine the...

A HIERARCHICAL, TEMPORAL DECOMPOSITION APPROACH TO LONG HORIZON OPTIMAL CONTROL PROBLEMS (1986)

CHANG, SHI-CHUNG

This dissertation presents a new solution methodology for the Generalized Scheduling Problem (GSP) in operation scheduling of engineering systems. A complex operation scheduling problem is commonly...

Water vapor permeability tests for building papers / (1951)

Chang, Shi-chung.

Envelope containing building paper samples inside back cover.